Een primeur in Australi?! Onlangs plaatste onze Australische agent SIS vier duurzame prefab FiberCore golfbruggen op het terrein van de Castle Hill Country Club in Norwest, nabij Syndey. Dit zijn de eerste vier van hopelijk vele bruggen met onze unieke InfraCore? Inside technology die we naar Australi? mogen verschepen. Deze oersterke onderhoudsvrije bruggen hebben een levensduur van meer dan 100 jaar.
„Sustainable Infrastructure Systems have been a pleasure to work with through the design and install of our new bridge. They were very professional in all areas and the entire process from design to install was seamless and easily met our timeframes.?
FiberCore Golf Bridges are new into Australia. SIS worked with us to produce a bridge that was capable not only of heavy loads but was designed in a way to meet the aesthetic requirements for a golf course?
If you are looking for an innovative product and a company with the flexibility to meet your business needs, I would highly recommend Sustainable Infrastructures Australia.“?
Course Superintendent?Castle Hill Country Club Mitchell Brooks?
In opdracht van de provincie Noord-Brabant heeft FiberCore een fietsbrug gebouwd die onderdeel uitmaakt van het project Gemert Noord-Om dat door BAM Infra wordt uitgevoerd. De Noord-Om vormt vanaf eind 2017 de schakel tussen de N605 en de N272 die ten zuidoosten van Gemert loopt. Duurzaamheid en innovatie gaan hier hand in hand. Naast een bijzondere 3D geprinte fietsbrug en een ingeschoven rotonde bevindt zich over de nieuwe randweg de tot nu toe langste ingeklemde composiet brug onder de naam Lieve Vrouwesteeg: 37 meter vrije overspanning uit ??n stuk en een minimale bouwhoogte. De brug werd inclusief leuningen en slijtlaag ?prefab? bij FiberCore geproduceerd.
?Het installeren verliep buitengewoon vlot?, zegt Rob Leenders, projectmanager van BAM Infra. ?Omdat de brug maar 26 ton weegt, konden we deze razendsnel, in een halve dag, plaatsen zonder overlast voor omwonenden.? BAM Infra merkt dat provincies steeds vaker vragen om zowel innovatieve als duurzame oplossingen bij de aanleg van nieuwe infrastructuur. ?De toepassing van nieuwe materialen of nieuwe technieken wordt op prijs gesteld en daar spelen wij graag een rol in?, zegt Leenders.
Ter vervanging van twee houten bruggen in de Amsterdamse Bijlmer schreef de gemeente Amsterdam en Stadsdeel Zuidoost een wedstrijd uit onder architectenbureaus. Het ontwerp van Korth Tielens Architecten won die wedstrijd. Er werd gekozen voor FiberCore composiet bruggen met InfraCore? Inside technology vanwege de vormvrijheid en het duurzame karakter van het materiaal. Het architectenbureau noemde de brug zelf een Bijlmerbeauty. Deze verzonnen term voert terug op de brugleuningen, waarin een deel van de geschiedenis van de Bijlmermeer verwerkt is. Bij een specifieke benadering van de brug zijn weergaven van Bijlmerbeelden in te leuningen terug te zien.
Onlangs plaatste FiberCore Europe samen met Anton Groep voor Gemeente Den Helder deze duurzame prefab composiet brug aan de Ritmeesterweg in de nieuwbouwwijk Nieuw Den Helder. De brug met een vrije overspanning van 21 meter en is 4,5 meter breed, is ontworpen voor fiets- en voetgangers verkeer, maar kan ook een service-voertuig van 6 ton overheen en er is zelfs rekening gehouden met een ‚onbedoeld voertuig‘ van 12 ton. De brug werd binnen slechts enkele minuten geplaatst. Dit komt o.a. door het hele lage gewicht van de brug.
Overdag ligt ze er al prachtig bij, met haar sierlijke slanke vormen en bijzondere witte brugdek, maar wil je haar in volle glorie aanschouwen; bezoek haar dan als het donker wordt. Met haar elegant verlichtte leuningen is ze op haar mooist.
Deze bijzondere brug maakt als geen ander gebruik van een aantal van de unieke eigenschappen van composiet. De vormvrijheid van onze prefab composiet bruggen wordt ten volle benut in dit glooiende ontwerp. Maar ook voor het zeeklimaat van Malm? is composiet een uitstekende keuze: het materiaal is ongevoelig voor invloeden van buitenaf (zoals zouten) en roest of rot niet. Daarnaast is de brug nagenoeg onderhoudsvrij en daarmee een duurzame oplossing.?
Door haar lichte gewicht werd de prefab brug met minimale hinder voor de omgeving in no-time geplaatst op de historische kademuren van Malm?.
Owner of the bridge: Malm? stad, Sweden
Project manager: Inga-Lill ?lin, City of Malm?
Bridge expert: Abbas Khayyami, City of Malm?
Idea and design of bridge: Reinertsen / ?F , Malm?
Lighting design: Johan Moritz IALD, City of Malm?
Contractor: NCC
This bridge is located in Sandsend which is a small fishing village north of Whitby in a conservation area. It is a popular tourist attraction in the summer with award winning beaches. To cross the Sandsend Beck in the village pedestrians had to use a narrow stone road bridge which was not a safe arrangement so North Yorkshire County Council decided to install a new foot and cycleway bridge downstream of the road bridge.
In September 2016 the Council invited tenders for the design and supply of a new FRP footbridge which was won by Lifespan Structures.
Design
The contract required that the bridge be designed to the requirements of the European Code CUR96 for FRP bridges and relevant Eurocodes with a completed AIP submission, Cat 1 check and design life of 50 years. The proposed bridge deck was based on a resin infused FRP deck system utilising Infracore technology. The span was 16.7m and total bridge length 17.1m with a 3m clear width and depth of 410 mm. The deck was designed with a 120m manufactured radius to prevent water ponding on the deck and for aesthetics. The Council selected an aluminium parapet 1.15m high side fixed to the deck which matched the parapets nearby.
Installation
The deck weight was 6700 Kg and the parapet weight was 1200 Kg which is significantly less than a traditional steel bridge. This eliminated the need to close the road through the village for a crane lift. The bridge deck was delivered to site complete with surfacing in February 2017 along with the parapet. The installation contractor was able to quickly lift the bridge from the delivery lorry on to a sand berm using two excavators. The parapet was fitted and the bridge lowered into position the following day.
The original Bird Ridding Footbridge was a 15m long bridge close to Coverham in the District of Richmondshire, North Yorkshire. The bridge crossed the River Cover and was removed late 2015 due to continued use even after being closed as the bridge being deemed unsafe to serious corrosion issues. The bridge was a single span steel bridge built which was built on a concrete abutment 1m deep which was then sat on a stone wall.
Original Steel Footbridge at Bird Ridding
In February 2016 North Yorkshire County Council tendered a design and supply project for a replacement FRP Bridge, which was won by Lifespan Structures.
Design
The contract required that the bridge should be designed to the requirements BD90/05 and relevant Eurocodes. The proposed bridge was based on a resin infused FRP system utilising Infracore technology.??The span was 14.7m with a 200m longitudinal radius, a total section depth of 600mm and a clear width of 1.2m between parapets.??The FRP bridge deck allows for the installation of a 1.15m high, powder coated, galvanised steel parapet to be installed on the outside end of the deck.
The outputs from the design process were;
The maximum deflection under a characteristic live load of 5kN/m2 was 34mm, less than span/300.
The minimum natural frequency was 5.0 Hz, Greater or equal to 5Hz.
All strains were kept below allowable limits under ULS load cases.
Bolted connections shall accommodate an allowance of at least +/-7mm for thermal expansion.
FRP Bridge Cross Section at Bird Ridding
Elevation of New Composite FRP Footbridge at Bird Ridding
Manufacturing and Installation
The installed bridge deck weighs 3500kg and the galvanised powder coated steel parapet weighs 1050kg. Access to the remote location meant that installation method needed to be considered, and the lightweight nature of the FRP deck allowed the bridge to be lifted into position using tracked mechanical excavators.
FRP footbridge being lifted into position at Bird Ridding
The FRP bridge deck was lifted into place and the handrail installed insitu.??A slip resistant surfacing material is applied to the wear surface of the bridge during the manufacturing process.